1,In the process of mould processing
quality control
1. Mold parts processing quality control.
1) for each part drawings, technical
requirements, completion time requirements; Did not note tolerances size used 1/2 it12 tolerance grade or match.
2) machining personnel shall be in
accordance with the requirements of parts drawing size, and asked after
machining self-inspection, and specified on the drawing
Self-check result and date (signature). For
measurements, the introspection of artifacts, once found fault inspection the
size of the workpiece, the losses caused by twice to punish processors output,
and order as soon as possible to complete reproduction of the workpiece.
3) fitter group machining all outside the
scope of the cooperation, should be arranged by the workshop processing, finish
machining JingJian
Returned to the bench after inspection
qualified team, by the fitter leader acceptance, and output by the workshop
management personnel registration processing personnel.
4) fitter team internal processing parts,
the team leader is responsible for the control of the processing quality, and
indicate the likely on the drawings
The size of the changes.
2. The quality control of mold assembly
1) assembly fitter are responsible for the
quality of a complete set of mold, fitter carefully check before assembly parts
quality (including the materials
Heat treatment, machining quality), for the
unqualified parts may affect the whole mold quality, should change in time or
reprocessed.
2) fitter carefully crafted in the assembly
process, to ensure that the mold assembly accuracy, make it to the design
requirements of using
Life, the production efficiency, produce
comply with the design requirements of qualified products.
3) after completion of assembly,
responsibility fitter mold of a complete set of self-inspection again
carefully, to ensure the success of the test qualified, after inspection
Open the mould, fill in test application
form, hand in workshop management.
4) workshop staff after receiving the
application form to arrange the designer and is responsible for the fitter for
mould quality inspection together, sign a release
Try to arrange after see mold.
2, The mold factory quality
requirements:
1. Mould installation neat all parts
according to relevant requirements, reliable, complete accessories, parts for
on-site installation, must have a written procedures.
2. Mold production of products subject to
quality inspection, comply with the design requirements or customer
requirements.
3. The mould all sports institutions, all
should guide sliding flexible, motion is stable and reliable, fit clearance,
appropriate and factory processing lubrication.
4. The mold parting surface and all molding
surface, factory should make antirust processing. 5. Die appearance and
installation dimensions, deal with the following conditions:
1) the edge of the template should be 2 x45
"chamfering, mounting surface should be smooth level off, should not have
prominent screw head, pin
Head, burr and injury.
2) the reference Angle of mould should be
seal on mould number, there is no lifting and moving mold, rings with screw
Pit.
3) the size of the tooling parts, shall
comply with the selected models.
4) separate surface except the guide sleeve
hole, pin hole, all the holes in the process of mould manufacturing process,
screw hole should be blocked
Plug and parting surface level.
The workshop managers and designers
should be the factory mold for detailed inspection, signing after confirm
qualified mold certificate, registered fitter output by workshop management
personnel.
quality control is very important for our company,Because Product quality is the lifeline of the enterprise
quality control is very important for our company,Because Product quality is the lifeline of the enterprise
more information www.cnmoulding.com www.plastic-injectionmoulding.com